Superior Choice Credit Union | Superior, WI
The Challenge
The client needed a partner who could execute a phased curtain wall replacement with minimal disruption to an operational building. In Phase 1, half of the existing glazed aluminum curtain wall had to be carefully removed while preserving the structural integrity of the remainder. The success of this complex first phase led to an award for Phase 2, which required the same level of precision and coordination. Completing both phases under tight timelines and structural constraints demanded a trusted, capable partner.
Our Solution
As a recognized Top 50 Contract Glazier, St. Germain’s brought strategic foresight to this project. Our team measured to unknown points and fabricated the curtain wall with minimal references. By working in sync with the framing team and incorporating allowances for field variances, we were able to move forward confidently with glass ordering and maintain momentum without compromising accuracy.
Results Accomplished
Thanks to our meticulous planning and experienced field crew, the project was completed with remarkable precision. Mismeasures were nearly eliminated, even with the inherent unknowns. The result was a clean, high-performing installation delivered on time—demonstrating why clients rely on us when precision and reliability matter most.
Why was St. Germain’s best suited for the work?
St. Germain’s was the clear partner of choice due to our seasoned glaziers and client-focused approach. Our team’s ability to adapt in real-time, accurately interpret field conditions, and deliver a seamless installation speaks to our reputation in the industry. When faced with complexity, clients trust our expertise, craftsmanship, and commitment to doing the job right.
Success Story
Project Start October 2022
Project End September 2023